Current Position : HOME/Welding Wire/ ER3003 aluminum TIG welding rod

ER3003 aluminum TIG welding rod

Author: Time:2023-05-17

ER3003 is the aluminum manganese alloy for welding, aluminum alloy electrode for base type coating.
Its characteristic is that the cold wind strength is higher, the corrosion resistance and the pure aluminum
are almost the same. DC power supply, welding electrode, short arc welding. Arc stability is poor, the
splash is relatively large.



 
Uses: used in the welding of aluminum manganese alloy, pure aluminum and other aluminum alloys.

Mechanical Properties (reference value)
Item Tension Strength(MPa) Cold bending angle  D=2T
Standard ≥95 -
Result 120--135 120--180

Reference current: DC+
Welding rod Diameter(mm) 3.2 4.0 5.0
Welding Current(A) 80--110 110--150 150--200

      ER3003  Aluminium & Aluminium Alloy welding Rods
Classification GB/T 10858-2008  AWS A5.10 ····       ER 3003
 
Typical composition in %
Si················            <0.60
Fe················            <0.70
Cu·················       0.05—0.20
Mn·················    <1.0--1.6
Zn··················         <0.10
Al··················          Remaining
Shielding gas Argon, Helium, or Argon/Helium—mixtures.
Dimensions Φ MIG—Rods (mm):
0.8 ; 0.9 ; 1.0 ; 1.2 ; 1.6 ; 2.0 ; 2.4
 
TIG —rods(mm):
1.6 ; 2.0 ; 2.4 ; 3.2 ; 4.0 ; 5.0 ; 6.0
Rod Packagings Mig Rods :
 
S100/0.5kg 1Lb , S200/2kg , S270-S300/6kg-7kg
Tig Rod ) :
 
5/10kg     ·······     length :1000mm



Note:
 
1. Electrode is extremely easy to be affected with damp, so should be stored in dry sealed containers, in order
to prevent damp metamorphism.
 
2. Before welding, the welding rod is about 150 degrees Celsius for 1-2 hours.
 
3. Should be welded by plate, and to 200--300 degrees after welding according to the thickness of heating
welding. Welding process, the welding rod does not do the lateral swing, in order to improve the welding
speed, welding electrode should be perpendicular to the surface, the arc should be as short as possible.
Replacement of electrode must be carried out quickly.
 
4. The welding parts must be clear before welding, impurities. After welding should carefully clear slag, and
use steam or hot water washed clean.




 


CONTACT US
CONTACT US
Looking Forward to Your Response!

Mobile:86 17344894490

Email:inquiry@signialuminium.com

Address:A126 Building 4, No.89 Science Avenue,National HI-Tech Industry Development Zone,Zhengzhou,Henan